Home
Contact
Glossary
References
Job Board
Feedback
GET DATA 📊
Login
Search for:
Search
Assessment, Inventory, and Monitoring
Support for BLM AIM projects and programs
Skip to content
Planning &Project Initiation
Defining Roles & Responsibilities
Design
Step 1: Develop Management Objectives
Step 2: Set Study Area and Monitoring Objectives
Benchmarks
Setting Benchmarks
Step 3: Select criteria for stratifying the study area (if necessary)
Step 4: Select and document supplemental monitoring methods; estimate sample sizes; set sampling frequency; develop implementation rules
Step 5: Collect and evaluate available data to determine sampling sufficiency and the validity of the strata (if available)
Step 6: Apply Stratification and Select Monitoring Locations
Step 7: Data Management Plans
Monitoring Design Example
Data Collection
Crew Hiring & Equipment
Point Evaluation & Rejection
Monitoring Design & Trip Planning
Field Sampling
Data Capture Applications
Data Management &Project Evaluation
Data Access
Quality Assurance
Quality Control
Lotic Quality Control
Terrestrial Quality Control
Project Evaluation & Revision
Analysis &Reporting
Overview of the Process
Terms & Concepts
Step-by-Step Guide
Preparing for Analysis
Conducting Analysis
Interpreting the Results
Tools Used in Data Analysis
Examples of AIM data in use
Training
Resource Neutral Training
AIM Project Leads Training
Lentic AIM Training
Lotic AIM Training
Lotic AIM Data Webinars
Lotic AIM Field Training Tutorials
Terrestrial AIM Training
Terrestrial Core Methods Training
Terrestrial Core Methods Instructor Training
Webinars and Online Resources
Home
Data Management & Project Evaluation
TerrADat Ingestion Tree
TerrADat Ingestion Tree
Comments are closed.